The MPLS WG Archive

Cell Relay Retreat>MPLS WG Archive>month:2003-Jun> msg00046



[Date Prev][Date Next][Thread Prev][Thread Next]  
  [Date Index][Thread Index][Author Index][Subject Index]

WG lat call on LSR and LDP MIB modules - CORRECTION!

  • From: Loa Andersson <loa@pi.se>
  • Date: Tue, 10 Jun 2003 08:12:00 +0200
  • CC: Loa Andersson <loa@pi.se>, Bert Wijnen <bwijnen@lucent.com>, Alex Zinin<zinin@psg.com>
  • User-Agent: Mozilla/5.0 (X11; U; Linux i686; en-US; rv:1.0.0) Gecko/20020605
  • X-Original-Recipient: mpls@UU.NET

All,

a missundertanding between me and the authors resulted in that the
wrong version of the LDP mib module was sent to this wg last call.

THe correct version is

<draft-ietf-mpls-ldp-mib-11.txt>

this has just been sent for publication (and with a copy to the
mailing list).

My take is that we continue the wg last call as planned, but as
soon as I see the LDP mib being published I will extend the last
call period. This way will get both a head start and the required
period of time.

/Loa

Loa Andersson wrote:
> All,
> 
> this is to initiate a two week wg last call on
> 
>         Multiprotocol Label Switching (MPLS) Label Switching
>         Router (LSR) Management Information Base
>         <draft-ietf-mpls-lsr-mib-10.txt>
> 
> and
>         Definitions of Managed Objects for the Multiprotocol Label
>         Switching, Label Distribution Protocol (LDP)
>         <draft-ietf-mpls-ldp-mib-10.txt>
> 
> this wg last call ends June 22nd, and is limited to the changes in the
> IDs since the previous wg last call, as well as interdepencies between
> the two mib modules and the mib modules listed below.
> 
> For the LSR MIB please re-read the mail I sent to the list June 6 called
> "prequeal to WG lat call om the LSR mib module"
> (OK - my spelling, but admit that it is charming :) )
> 
> A usual silence will be understood as support, but this would not
> necessarily stop you from giving positive comments. Please do.
> 
> There are more MIB modules coming up for wg last call and that have been
> through wg last call, all of those will have interdependencies.
> 
> 1. the TC mib module are wg last called and updated, but waiting for the
>    others to be ready for IESG review
>    <draft-ietf-mpls-tc-mib-07.txt>
> 2. the TE link MIB module is in wg last call (to end June 13)
>    <draft-ietf-mpls-telink-mib-02.txt>
> 3. the management overview has been through wg lst call and has been
>    uppdated
>    <draft-ietf-mpls-mgmt-overview-05.txt>
> 
> Two other MIB modules are in the pipe and new version will be released
> shortly
> 
> 5. The TE mib module  <draft-ietf-mpls-te-mib-nn.txt>
> 6. The FTN mib module <draft-ietf-mpls-ftn-mib-nn.txt>
> 
> It is important that we complete this process of reviewing and updtating
> before the ID cut off date (June 30) for the Vienna meeting.
> 


-- 
/Loa

mobile + 46 739 81 21 64
email: loa@pi.se