The MPLS WG Archive
[Date Prev][Date Next][Thread Prev][Thread Next] [Date Index][Thread Index][Author Index][Subject Index]
GMPLS - PSC switching capability
-
From: Zafar Ali <zali@cisco.com>
-
Date: Tue, 28 May 2002 19:24:07 -0400
-
Cc: <gmpls-ops@mplsrc.com>
At 07:44 PM 5/28/2002 +0530, M.N.V.Suryanarayana
wrote:
Hi,
Can someone provide an example in which the interface switching
capability
is set to PSC-2/PSC-3/PSC-4. The examples in section 7 of
draft-ietf-ccamp-gmpls-routing-04.txt does not cover the
PSC-2/PSC-3/PSC-4 interface switching capability.
Hi Suryanarayana,
You can construct a deployment scenario by thinking in terms of VP
and VC level switching hierarchy in ATM. This way you can aggregate many
flows into a single LSP at the higher level in the hierarchy, etc. While
ATM hierarchy is limited to the two level, MPLS technology can support
such (packet) hierarchy at PSC-1, 2, ..., 4 levels.
Thanks
Regards... Zafar
Thanks & Regards,
Surya
> -----Original Message-----
> From: owner-mpls@uu.net
[mailto:owner-mpls@uu.net]On
Behalf Of Manral,
> Vishwas
> Sent: Tuesday, 28 May 2002 5:03 PM
> To: 'bharathir@future.futsoft.com'; mpls@uu.net
> Cc: gmpls-ops@mplsrc.com
> Subject: RE: GMPLS - PSC switching capability
>
>
> Bharathi,
>
> Though I do not know much about GMPLS, however the draft
>
>
http://www.ietf.org/internet-drafts/draft-ietf-ccamp-gmpls-rou
ting-04.txt
states that
"If an interface is of type PSC-1 through PSC-4, it means that the
node
receiving data over this interface can switch the received data on
a
packet-by-packet basis, based on the label carried in the
"shim" header
[RFC3032]. The various levels of PSC establish a hierarchy of LSPs
tunneled
within LSPs."
Hope this is what you were looking for,
Thanks,
Vishwas
> -----Original Message-----
> From:
Bharathi R
[mailto:bharathir@future.futsoft.com]
> Sent: Tuesday, May 28, 2002 4:04 PM
> To: mpls@UU.NET
> Cc: gmpls-ops@mplsrc.com
> Subject: GMPLS -
PSC switching capability
>
> Hi,
> Can anyone tell me why GMPLS routing Extension mention 4 different
PSC
> switching capabilities?
> What is the significance of having 4 different PSC switching
capabilities?
> Thanks & Regards,
> Bharathi
>
***************************************************************************
This message is proprietary to Future Software Limited (FSL)
and is intended solely for the use of the individual to whom it
is addressed. It may contain privileged or confidential information
and should not be circulated or used for any purpose other than for
what it is intended.
If you have received this message in error, please notify the
originator immediately. If you are not the intended recipient,
you are notified that you are strictly prohibited from using,
copying, altering, or disclosing the contents of this message.
FSL accepts no responsibility for loss or damage arising from
the use of the information transmitted by this email including
damage from virus.
*************************************************************************** ===============================================
Zafar Ali
Cisco Systems
100 S Main St. #200
Ann Arbor, MI 48104.
Mobile: (734) 276-2459, Off: (734) 302-4143, Fax: (734) 302-4190
email:
zali@cisco.com
| |
|